This websites uses cookies, by continuing to browse the site you are agreeing to our use of cookies. View our privacy policy.
Contact form

Send us your contact details and a member of our team will get back to you as soon as possible.

Enter security code:
 Security code

A reliable, efficient partnership with Sisk Rail

OneFifty has recently completed a project to remove graffiti from rail infrastructure for Network rail on behalf of Sisk Rail. This is the third year running that Sisk Rail has used our services, this time the project involved cleaning 36 sites between London and Bristol over an eight week period, with all work carried out to exacting time frames.

Variety of cleaning systems to suit

Rail infrastructure encompasses a variety of building structures including trackside at the stations, bridges, tunnels, sidings and retaining walls, as well as different building substrates - stone, concrete, metal and brick. Each location can require a different method of access and cleaning in order to achieve the best results.

In this round of work, when dealing with graffiti on a metal bridge structure, it was deemed more efficient to paint over the graffiti rather than remove it. We used media blasting with recycled powdered glass to clean the very old brick underpass at Swindon station, as it is the most efficient method for removing graffiti without causing damage to the brickwork. 

We also used media blasting to remove graffiti from a long expanse of retaining wall running alongside private farmland. Here we were working above a drainage ditch and media blasting was the most ecologically sound approach.

Efficient planning

All of the cleaning work needed to be completed within an eight week time frame and be planned to fit within extremely exacting timeframes. Some locations needed to be cleaned at very specific times – often out of hours - to fit with other trackside work and take advantage of line closures. We pride ourselves in our ability to plan and manage work and successfully completed all graffiti removal within the required timeframes and to a high standard.

Health and Safety, insurance, traffic permits – sorted

There are very specific requirements associated with working trackside and all work was carefully planned and carried out in line with Network Rails’ strict Health and Safety regulations.

Some of the sites also required traffic management permits while others needed specialist high-level access. Our professional team is experienced in arranging traffic management - including liaising with councils to arrange road closures permits - and in organising access for high-level cleaning. Security and insurance was all sorted out on behalf of our client making their life a lot easier.

 

To find out more about our exterior cleaning services contact Max or Andy on 0333 234 1445 or email your enquiry and we will get back to you as quickly as possible.

View all case studies >

Some of our clients

Somerset-Council-logo-grey100SISK-grey100Sainsbury-s_Logo_grey100Oasis-Logo-grey100NHS-Wales-grey100national-trust-logo-grey100Cabot_circus_logo-grey100Ashton_Gate_Logo-grey100Bears-logo-grey100client-big-yellowclient-bristol-sportclient-bristol-universityclient-jllclient-lshclient-mcdonaldsclient-safestoreThe-Landscape-Group-logo(1)

Client Testimonials

“One Fifty from top management, costings and most importantly site crew were extremely professional and did a very good job.”

Tim Hanley - Lake Edge Ltd

“Excellent to deal with from start to finish, very professional in their attitude and kept us informed at every stage. ”

Esther Hunting - Warwick Estates

“OneFifty are always reliable, quick to respond and produce high-quality results.”

Lorna Barnet - Director of Barnet Development

“I just wanted to let you know that we are on site today and think that the building is looking so much better, so thank you very much for that.”

Anita Pitts - Hartwell House

“They were brilliant, every team member was helpful, polite and very knowledgeable. ”

Neil Tarling - Berkshire Labels

“Please pass on my sincere thanks to guys for the demo and for getting Neptune cleaned.”

Wendy Tomlinson - Senior Conservation Officer, Cheltenham Borough Council

Our Accreditations

accreditation-safecontractoraccreditation-ipafaccreditation-pasmaaccreditation-avettaaccreditation-smasaccreditation-ssipaccreditation-cscs